PROFILE- METAL MANUFACTURE

All Construction Engineering manufactures to specification most ferrous and stainless steel component for heavy industry. We are strategically located in an industrial complex with galvanising and painting operations nearby. We also have strong alliances with additional processing operations including profiling, rolling and pressing and machining.

We have highly qualified manufacture staff with supporting documentation including weld procedures and welder qualifications. Manufacture data reports with full tractability can be produced if requested to meet any standard including AS1554, AS4041 and AS1210.

Manufacturing Output:

As a guide we can produce the following output with the assistance of external pre-processing.  A lead time of approximately 2 Image1week would need to be added to the times below.

Heavy Structural steel:            50 Tonnes per week.

Complicated Chute work:       15 Tonnes per week.

Pipe work:                               15 Tonnes per week

We are happy to review any manufacturing project and offer solution to manufacturing needs.

 

 

 

 

Post Manufacture Testing and Surface Treatment and Records: Image2

We have ready access to NATA registered non destructive testing through Bureau Veritas local testing services. Die penetrant, Magnetic Particle, Ultrasonic and Gama Radiograph testing are readily available.

Galvanising and industrial painting finishes are generally applied to complete fabrications. QA and/or Certificate of compliance are available on request for these surface finishes.

Image3Trial assembly of completed arrangement can also be carried out on request to ensure any design, detailing or manufacturing errors are corrected before delivery.

Full quality assurance documentation can be generated if requested to cover any client requirements.

 

Typical Manufacturing Experience

Project

Project Summary

Photo

Short Run Flour Mill - Bomaderry.

Manildra Group

The project consisted of the design, manufacture and installation of 350 tonnes of galvanised heavy structural steel beams and columns as part of for a 5 storey industrial building project

Specifications.

Manufacturing Duration: 10 Weeks

Quantity Steel: 230 Tonnes

Image4

West Cliff Upgrade project

Fine coal circuit sump.

BHP Billiton

The Manufacture of a coal washery process sump including alumina wear tiles and machined sump base,

Specifications:

Manufacturing Duration: 12 Weeks

Quantity Steel : 12 Tonnes

Image5

Kestral Dewatering Chutes

Cove Engineering

The manufacture and trial assembly of a dewatering chute assembly including machined surfaces

Specifications:

Manufacturing Duration: 8 Weeks

Quantity Steel: 10 Tonnes

 

 

Image6

Boral Cement – Berrima Works

Manufacture and installation of main air bifurcation duct.

Specifications:

Manufacturing Duration: 6 Weeks

Quantity Steel:  10 Tonnes

 

 

Image7

 

Picton Flour Mill


Access stairways and platforms.

John Holland

The detailed design, manufacture and installation of access stairways and platforms around the flour mill complex.

Specifications:

Manufacturing Duration: 30 Weeks (incl. Design)

Quantity Steel: 30 Tonnes

Image8

 

 

Main drive Stainless Steel cooling water Pipe work

Bluescope Steel

The manufacture and installation of 316 S/S pipe work for the main mill 3MV drive motors.

Specifications:

Project Duration: 8 weeks

Quantity Steel: 5 tonnes